MAJORResolved
Data Center Power Outage — 22-23 May 2026
Started 6 months ago · Resolved 6 months ago
Affected components
Handling stages and targets
- Investigating23 May 2026, 02:15 WITA
- Identifiednot recorded
- Monitoringnot recorded
- Resolved23 May 2026, 10:26 WITA
| Initial response | 68 d 12 h | target ≤ 30 min | Missed |
| Recovery | 8 h 11 min | target ≤ 8 h | Missed |
Initial response = the first update from the NOC after the outage was detected. An outage that recovered before the initial-response limit counts as handled. Targets follow severity: Critical ≤ 15 min/≤ 4 h, Major ≤ 30 min/≤ 8 h, Minor ≤ 1 h/≤ 24 h.
Timeline
- Resolved4 months ago
A power supply failure in the server room made every service and the network infrastructure unreachable for approximately 8 hours 11 minutes (23 May 02:15 - 10:26 WITA). The technical team completed recovery and all services are operating normally again.